{"product_id":"lynxking-check-cord-dog-leash-long-lead-training-tracking-line-comfortable-handle-heavy-duty-puppy-rope-10ft-15ft-30ft-50ft-for-small-medium-large-dog-blue","title":"lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog Blue","description":"\u003cdiv\u003e\n\u003chr aria-hidden=\"true\" class=\"a-divider-normal\"\u003e     \u003ch1 class=\"a-size-base-plus a-text-bold\"\u003e About this item \u003c\/h1\u003e                 \u003cul class=\"a-unordered-list a-vertical a-spacing-mini\"\u003e  \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3\/8” is a suitable thickness for long training dog leash, it has both strength and portability  \u003c\/span\u003e\u003c\/li\u003e  \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming  \u003c\/span\u003e\u003c\/li\u003e  \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won't get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.  \u003c\/span\u003e\u003c\/li\u003e  \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.  \u003c\/span\u003e\u003c\/li\u003e  \u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003e SIZE: 3\/8\" (9.5 mm) in diam ,Size of this one is 30foot,color blue, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose  \u003c\/span\u003e\u003c\/li\u003e  \u003c\/ul\u003e   \u003c!-- Loading EDP related metadata --\u003e\n                    \u003cdiv data-csa-c-content-id=\"voyager-product-details-jumplink\" data-csa-c-slot-id=\"voyager-product-details-jumplink\" data-csa-c-type=\"link\" class=\"a-section\" data-csa-c-id=\"cdm1q4-ckis3-1dey74-46k44c\"\u003e \u003cspan class=\"caretnext\"\u003e›\u003c\/span\u003e \u003ca id=\"seeMoreDetailsLink\" class=\"a-link-normal\" href=\"#productDetails\"\u003e \u003c\/a\u003e \u003c\/div\u003e\n\u003c\/div\u003e","brand":"thetailstore","offers":[{"title":"Default Title","offer_id":47188095402183,"sku":"TS8HM4QFDR","price":34.49,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0809\/5383\/5719\/files\/61EGZ9DIpUL.jpg?v=1789551020","url":"https:\/\/tailbasket.com\/products\/lynxking-check-cord-dog-leash-long-lead-training-tracking-line-comfortable-handle-heavy-duty-puppy-rope-10ft-15ft-30ft-50ft-for-small-medium-large-dog-blue","provider":"Tail Basket","version":"1.0","type":"link"}